Selected Work
NGT Mukhanovo–Kuibyshev Oil Pipeline
Partner showcase: pipeline construction with HDD/DD methodology. Delivered February 2025.
Overview
About the project
A partner showcase with NefteGazoTekhnologii (NGT): construction of the Mukhanovo–Kuibyshev oil pipeline using horizontal directional drilling, delivered in February 2025.
HDD/DD methods let pipelines cross terrain and infrastructure with minimal surface disruption — a core capability of NGT's Samara-based engineering teams.
At a glance
Feb 2025
Delivered
Oil pipeline
Type
NGT
Partner
Start a project
Have a project in mind?
From solar fields to pipelines to mobility platforms — brief us and we'll map the route to delivery.