NGT Mukhanovo–Kuibyshev Oil Pipeline

Partner showcase: pipeline construction with HDD/DD methodology. Delivered February 2025.

Overview

About the project


A partner showcase with NefteGazoTekhnologii (NGT): construction of the Mukhanovo–Kuibyshev oil pipeline using horizontal directional drilling, delivered in February 2025.

HDD/DD methods let pipelines cross terrain and infrastructure with minimal surface disruption — a core capability of NGT's Samara-based engineering teams.

At a glance

Feb 2025

Delivered

Oil pipeline

Type

NGT

Partner